DIY Video : How to Generate FREE POWER by building a Homemade Waterwheel Microhydro System from Start to Finish



    RECENT POSTS YOU MIGHT LIKE
    • DIY Video : How to dig your own shallow water well for the garden
      This project goes over the instructions on how you can dig your own shallow hand pump water well using simple tools and save a lot of money. Before digging the water well, you need to know the ground. You got to have the right soil for this system to work. If your soil type is silt, clay, sand or loam, then its ideal .In our case, we have the first 10 or 12 feet of fine glacial silt and below that there is glacial deposits of river gravel. The first step is to dig a hole for the well casing. The tools you need to dig the hole are six inch post hole auger , three quarter inch extension pipe with coupling at the end and couple of wrenches. Once you have spotted the area where you want to dig the well, you start by applying downward pressure on the auger by twisting it. It screws itself into the earth filling its basket with material. When it's full, you pick it up and dump it aside or in a wheel barrel. Sharpening the auger can help it cut through tree roots but it will not stay sharp long. It is important to do your best to keep the hole centered. Once the bottom is reached, we pull out the auger and remove the basket from the handle and insert one of the extension using the pipe wrench. The next part is getting the casing down the hole. For the casing we are using a cheap and readily available six inch PVC sewer pipe. We use a rasp to smoothen the end of the pipe so that it fits a cap . A round piece of PVC flat stock is bolted and glued on top of the cap using a PVC glue. This becomes the mounting base for the pitcher pump. To get started with driving the well point, we need a long piece of 10 foot pipe and a sandpoint, a couple of drive couplings. The drive couplings are steel rather than cast which makes them stronger. But most importantly, they have that small diameter so that they can slip down inside, making them not much larger than the diameter of the sand point itself. The sandpoint is made of perforated stainless steel and a cast iron point at the bottom. We connect the sandpoint and 10 foot pipes using the couplers and some Teflon tape. Now you don't want to hammer on your drive point or any of your fittings without them being quite tight because you need those extra threads to spread the load. We drive the whole thing with a homemade post hole pounder which is a gooseneck trailer hitch ball welded into a piece of pipe. We insert the sandpoint with the extension into the well casing and start drilling by hand. We are gonna find out how far down that water is by dropping a string with a bolt tied to it to the very bottom. We finally attach a black ABS suction by sliding it down into our pipe .Then we cover the pipe with our PVC casing . And once the casing has been firmly tamped down, we will pack around the casing and tap that into place. The final step is to install the pitcher pump and prime it by add some water. The top cap is installed on the casing opening and the pump is bolted to the top of the cap. Priming the pump simply entails pouring a little water in that top basin. https://www.youtube.com/watch?v=9mG4j4I13y4 https://www.youtube.com/watch?v=6p5ked9gKuQ https://www.youtube.com/watch?v=334mj68JU0I
    • DIY Video: How to build a Homemade Gravity fed ,Drip Waste Oil Heater for your Garage .Clean and Efficient
      This project goes over the build of a simple gravity drip fed waste oil burner that can be used to heat your shop/garage efficiently.It heats up the garage to about 30 to 40 degrees. Hot air from the center pipe reaches up to 500 degree celsius. Once dialed in, the smoke clears and the burner is stable at 400'C. The materials needed for this project are grinder,MiG welder,plasma cutter, scrap propane tank,hammer,enclosed brake disc, steel cooking pan, 4 inch 10ft pipe, bolts and iron rod and temperature sensor to keep track of the heat. The footing and the chimney pipe is welded onto the propane tank.Add a pipe right through the middle and weld the retainers for the pan and the legs around the vessel. To improve the airflow , we cut bunch of holes around the legs. Also added some more spaces on the legs to keep the temperature away from the concrete floor. We also make a venting hole on both sides at the middle of the propane tank . To adjust the temperature, we add 2 7/16 primary holes right at the base above the heating pan. You control the burner by adjusting the input airflow into the burning chamber. Don't make the air holes for the draft on the burner too big but have plenty of holes so that with the increase the temperature and the increase in airspeed, the draft the fresh air can actually get to the burner, and you will get cleaner burn. These secondary holes allow for more oil splatter to leave the burner if any water content is present. The drip system is kept open which helps you to check how much oil flow is there and also as a safety precaution. If there is any kind of flashback, it will pop out of here and not go all the way through the the pipe back into the reservoir. This whole system is completely serviceable, completely mobile,not bolted down.You can unhook the chimney, the exhaust pipe, remove the drip system pipe and the rest. The drip system is made of heavy pipe and a small ball valve that is welded in place at the distance and at a specific height so as to dissipate the heat coming from the burner. Also you dont want the oil to reverse its direction and go back into the pipe. With the help of a fans, we increase the heat dispersion. With two fans,one blows hot air away from the wall and the other allows extra air for the burn.It pulls cold air from the floor and allows fresh air intake. Effective heating and keep the heat away from the wall. To start the system, we pour the waste oil onto the steel pan and place it under the burner. Make sure you dont have any trace of water in the pan or oil. The oil will splatter out of the secondary holes if there is water.The more you can bring in to the burning chamber,the more it will burn and more it will smoke. https://www.youtube.com/watch?v=bAPOkkwXoxY https://www.youtube.com/watch?v=-Yz0tjDfYL0
    • How to Install a Complete Micro Hydro Alternative Free Power Generation System for your Home.
      This project goes over the details on how you can setup and install a 300W Off the grid Micro Hydro System for your home . The water source mentioned in this project have a flow rate of 15 - 30 gallons a minute and the drop between the source and the house is about 150 feet. The first step is to make an intake angled screen box for the system that helps in channeling the water from the source. The aluminum screen on the top blocks leaves, sticks and other debris to pass through into the box . The box is made of a 24 inch 2X10 ,2X4 and an 2X8 angled piece treated lumber. We add 3 one and quarter inch attachment points on the lower side of the box for the hdpe poly pipes. The box is secured using exterior screws on the outside and inner tubes on the seam to prevent leaks. The box is installed on the creek with help of couple of three and half inch concrete anchors and two boards are screwed on both the sides for support. The outlet poly pipes from the intake screen box goes to 55 gallon plastic barrel which acts as a silt catchment and also an air free source. The 3 outlet pipes are connected to the top of the barrel with the help of uniseal rubber gaskets. A 2 inch pipe is installed midway on the tank for the penstock. We also install an overflow pipe near the top of the tank to take the extra water out and a three inch cleanout pipe at the bottom . The cleanout pipe can be unscrewed to remove the silt and debris out. To take the water from the intake to the turbine, the penstock used here is a 100PSI 1100ft 2 inch poly pipe. A threaded adapter is glued to the outlet coming out of the barrel. It is then connected to a two inch full port shutoff ball valve followed by an another threaded adapter and a pipe. The penstock poly pipe is attached to this pipe using barb fittings with hose clamps. Next step is to install the pressure gauge and the surge tank to our penstock pipe. Water will come down through the poly pipe into another PVC pipe fitted with a pressure gauge, surge tank, two inch closing ball valve and a union to remove the turbine from the pipe. The surge tank is made of a standpipe that will prevent any water hammer affecting the pipes. The two inch poly pipe coming out from the barrel is connected to the two inch PVC surge tank and pressure gauge using regular . If the main shut off valve is suddenly closed, this tank will allow some of the surge to be absorbed. Next step is to build a housing for the micro hydro turbine. It is going to have a lid that opens up and a drain field pipe that goes out back to the creek. The housing for the turbine is made of three quarter inch plywood that is 2 X 2 foot wide and one foot tall. The turbine sits inside the hosing in the middle with the help of some 2x 4 scrap wood and a bucket lid piece. Then a 3 inch exit pipe comes out of here down through the middle of the housing .This drain pipe keeps the water from piling up under the turbine. The Micro Hydro Turgo Turbine is custom built based on the head pressure and the flow rate of the water source. It has three ball valves and four quarter inch jet nozzles coming out of them. The ball valves can be separately turned off when there is not enough water .The turbine is wired up to be three phase. The water coming out of the penstock hits jet nozzles that turns the Pelton wheel which is connected to 3 phase AC motor. To connect the turbine to our house, we use a 10/3 underground feeder wire. The wire is enclosed in a one inch conduit pipe. The proper way to install wire into a conduit is to get your conduit all glued together. And then you have a vacuum that pulls a string through. You tie your string to the wire and then pull the wire through the conduit. The wire goes into the house through a PVC conduit body. We install a junction box on the housing of the turbine to join the 3 phase turbine output wires to the 10/3 UG feeder wires coming from the house. Inside the house, we connect a rectifier to the three legs of the three phase coming from the turbine .This converts the AC generated into DC power. To generate useable power from this micro hydro system we need to install certain electrical devices in our houses. These include the MPPT Charge Controller, Grid Tie limiter Inverter, breaker box, disconnect switches and the batteries. These components are mounted on a 2 X 2 foot ,three inch plywood board. In case there is some excess heat for one of these electronics at some point, we cover the plywood board with a piece of sheet metal so that it will act as a heat sink. From the rectifier, the connection goes into a 25amp breaker box .The red wire goes into the breaker box and then further connects to positive of the charge controller. The negative white wire is directly connected to the negative of the charge controller. The five 12V AGM batteries are connected in series using four gauge cables. The positives from the batteries are connected to the charge controller and the inverter via DC switches .These switches allows us to isolate and disconnect the components individually. The negatives from the batteries are connected to the negatives of both charge controller and inverter respectively. The inverter is further connected to receptacle from where it goes straight to the main supply. https://www.youtube.com/playlist?list=PLTrfbWw_mKRL5Ae_x1Q4-1pOs0NJGwnzi